"Selection Of A Contractor For The Preparation Of A Complex Conformity Assessment Report With The Basic Requirements For The Construction And Technical Control Under The Structural Part And The Exercise Of Construction Supervision During The Construction Of Sites For Major Repairs Of Five Lots"