Package No. 04 (Consulting): Safety Assessment Of Bridge Groups On Routes Including: Route Dt.764 (Song Ray Bridge At Km18+860), Route Dt.765 (Suoi Da Bridge At Km7+795), Route 765B (Suoi Hai Bridge At Km3+932; Bao Binh Bridge At Km 11+804; Suoi Nhat Bridge At Km16+341), Route Dt.769 (Cai Hao Bridge At Km15+150; An Vien Bridge At Km 16+550), Route Dt.770 (Bridge No. 1 At Km2+068; Bridge No. 2 At Km5+868) And Route Dt.779 (Dam Rieng Bridge At Km1+117; Song Ray Bridge At Km4+530) And Ensure Traffic Safety During The Safety Assessment Of The Above Bridges.