Demolition And Reconstruction Of Local Toilets, Installation Of A Latrine Above The Table, Repair And Equipping Of Toilets, Repair And Reconstruction Of The Destroyed Wall Of The Paghman Qoryeh Farm With Installation Of A Latrine.