Construction Works For Mining At Zakłady Jsw S.A. Including: Construction Of Trench Xxxvii, Slipway Xi, Walkway 7B In Seam 408/1, Belt Trench N-2, Item 1000 (From The N-2 Conveyor Belt To The N-1 Fan Trench, Item 1000)